Projects
Maoming Port Shuidong Harbor Oil-gas Chemical Product Storage Area Land Formation Engineering
2012-12-14
Located within the working district along with the west bank line as planned for Shuidong Harbor and with a floor area of 49.5 ha, this project is backfilled with the 30,000t port excavation earthwork of Shuidong port. The land formation area is 44.3 ha and the coast protection is about 2,831m. |
>> Back << |